์ธ์ฒœ ์ฒญ๋ผ์ง€๊ตฌํŠน์ˆ˜๊ตฌ์กฐ๋ฌผ 3๊ณต๊ตฌ / 2008 

Bridges Design for Cheongna 3rd Sector / Incheon

DOMESTIC             OVERSEAS

์ธ์ฒœ ์ฒญ๋ผ์ง€๊ตฌํŠน์ˆ˜๊ตฌ์กฐ๋ฌผ 3๊ณต๊ตฌ / 2008 

Bridges Design for Cheongna 3rd Sector

์ธ์ฒœ ์ฒญ๋ผ์ง€๊ตฌ ๋‚ด์˜ ๊ต๋Ÿ‰๊ตฐ(8๊ฐœ) ๋””์ž์ธ. ๋‚ด๋ถ€์ˆ˜๋กœ๊ต 3๊ฐœ์†Œ๋Š” ๊ต๊ฐ์„ ์—†์• ๊ณ  ๊ฑฐ๋”์˜ ๋†’์ด๋ฅผ ์ตœ์†Œํ™”ํ•˜๋Š” ๋””์ž์ธ์œผ๋กœ ์ˆ˜๋กœ๋‚ด์—์„œ์˜ ํ†ต๊ฒฝ์„ฑ์— ์ค‘์ ์„ ๋‘์—ˆ๊ณ , ์‹ฌ๊ณก์ฒœ์„ ํšก๋‹จํ•˜๋Š” ์‹ฌ๊ณก2๊ต๋Š” ์ฐจ๋„๊ต์™€ ์ขŒ์šฐ์ธก์˜ ๋ณด๋„๊ต๋ฅผ ๋ถ„๋ฆฌํ•˜์—ฌ, ์ฐจ๋„๊ต๋Š” Preflex๊ตฌ์กฐ๋ฅผ ์ขŒ์šฐ์ธก์˜ ๋ณด๋„๊ต๋Š” ํŠธ๋Ÿฌ์Šค ๋ณตํ•ฉ์•„์น˜๋ฅผ ์ ์šฉ.


๊ต๋ช…: ์‹ฌ๊ณก2๊ต ์™ธ 7๊ฐœ
ํ˜•์‹: ์‚ฌ์žฅ๊ต ์™ธ
์ œ์›: ์‹ฌ๊ณก2๊ต(L=184m, B=36m)์™ธ 7๊ฐœ์†Œ
์œ„์น˜: ์ธ์ฒœ๊ด‘์—ญ์‹œ ์„œ๊ตฌ ๊ฒฝ์„œ๋™, ์—ฐํฌ๋™, ์›์ฐฝ๋™ ์ผ์›
๊ฑด์„ค์‚ฌ: ๋Œ€๋ฆผ์‚ฐ์—…
๋””์ž์ธ: EDI inc.
์—”์ง€๋‹ˆ์–ด๋ง: ๋™ํ˜ธ, ํƒœ์กฐ์—”์ง€๋‹ˆ์–ด๋ง
2008

The 3-bridges that cross a channel have a long-span structure without piers and minimize the height of a girder. And Singok-2 bridge which crosses Simgok-Cheon, has sidewalks(truss+arch) that are separated from the roadway (Preflex Girder).


Name: Simgok 2 Br. and other 7 Bridges

Type: Cable-Stayed Bridge(Steel)  

Specification: Simgok 2 Br(L=184m, B=36m), and other 7 Bridges

Location:  The neighboring areas of Gyeongseo-dong, Incheon, Korea


Architecture: EDI inc.

Engineering: DONGHO, TESO Engineering

Construction: DAELIM Industrial Co. Ltd

2008

(์ฃผ)์ด๋””์•„์ดํ™˜๊ฒฝ๋””์ž์ธ


EDI inc. All Rights Reserved.

์„œ์šธ์‹œ ๊ฐ•์„œ๊ตฌ ๊ณตํ•ญ๋Œ€๋กœ 212 ํ€ธ์ฆˆํŒŒํฌ11 B๋™ 1120ํ˜ธ / 07806

1120, 212, Gonghangdaero, Gangseogu SEOUL KOREA

+82 02 3474 3490

um_edidesign@naver.com

@bridgedesign_edi


EDI inc. All Rights Reserved.