Bridge design considers a clean natural environment in Anseong-Cheon and it's planned as a cable-stayed bridge with 7 towers.
- ECO: To minimise damages to ecology in Anseong-Cheon
- Identity: A bridge that leads to the vitalisation of tourism in Pyeongtaek-city
- Harmony: A bridge harmonious with the widely-spread horizontal natural landscape
Name: Pyeongtaek Br.
Type: Cable Stayed Bridge (Concrete)
Length: L=110=6@160+90+50=1,210m
Width: B=29.9m(two way 6-lane)
Location: Samjeong-ri, Anjung-eup~Dodu-ri, Paengseong-eup, Pyeongtaek-si, Gyeonggi-do, KOREA
Architecture: EDI inc.
Engineering: PEC, SAMAN
Construction: SK E&C
2009