The project’s purpose lies in ensuring smooth transportation of goods of Gwangju High-tech Industrial Complex, raising the quality of the traffic service.
Focusing to design the arch bridge that fit the advanced high-tech industrial complex.
Name: Cheomdan 2nd Br.
Type: Arch Bridge
Length: 416m(Main Br. 250m=65+120+65)
Width: 33~41m(Two way,6-lanes/ two sidewalks)
Location: Jiyangdong~Yongjeondong, Buk-gu, Gwnagju. Korea
Architecture: EDI inc.
Engineering: PEC
Construction: Korea Development Corp.
2006