In June 2012, PEC Consortium was awarded 'Consultancy Services for Proposed Construction of PMB Bridge, Road, and Utilities ordered by BEDB(BRUNEI Economic Development Board). EDI proposed three types of bridge, suspension, cable-stayed, and arch bridge.
Name: PULAU MUARA BESAR BRIDGE
Type: Cable-Stayed Br & other two
Length: 2,000m=17@60+200@2+23@60
Width: 29.1m(two way 4-lane)
Location: Muara~PMB Island, Brunei Darussalam
Architecture: EDI inc.
Consortium: PEC+SAMAN+KOREA EXPRESSWAY CORPORATION+SEOUL METROPOLITAN GOVERNMENT+JURUTERA OMC
2012