This bridge crosses various condition areas, wide roads, a stream, and forest areas. So we applied two bridge types considering the below conditions.
- For the road sections which are visually complex due to billboards and lights.
- For the stream and forest section to minimize environmental damage.
- For reducing the level differences between the two endpoints.
Type: Truss Cable-Stayed Br.+ Space Truss Br. (Steel)
Length: L=325m(50@3+175)
Width: 4.5m
Location: Yeouidodong Youngdeungpo-Gu, SEOUL, Korea
Architecture: EDI inc.
Engineering: PEC
2008